Best Well Installation in Kingman, AZ
Compare 7 local well installation providers in Kingman. Verified listings with real contact info.
7 services listed
Quick Compare
A-1 Arthur's Well Service Mohave County
693 Railroad St, Kingman, AZ 86401
Monday: 8:00 AM – 4:00 PM | Tuesday: 8:00 AM – 4:00 PM | Wednesday: 8:00 AM – 4:00 PM | Thursday: 8:00 AM – 4:00 PM | Friday: 8:00 AM – 4:00 PM | Saturday: Closed | Sunday: Closed
4.8 ★
30 reviews
Brown Drilling
3375 N Bank St, Kingman, AZ 86409
Monday: 8:00 AM – 3:00 PM | Tuesday: 8:00 AM – 3:00 PM | Wednesday: 8:00 AM – 3:00 PM | Thursday: 8:00 AM – 3:00 PM | Friday: Closed | Saturday: Closed | Sunday: Closed
4.4 ★
42 reviews
Plumbing by Jake
3270 Kino Ave #1, Kingman, AZ 86409
Monday: Open 24 hours | Tuesday: Open 24 hours | Wednesday: Open 24 hours | Thursday: Open 24 hours | Friday: Open 24 hours | Saturday: Open 24 hours | Sunday: Open 24 hours
4.8 ★
839 reviews
Oasis Pump
3931 E Andy Devine Ave, Kingman, AZ 86401
Monday: 7:00 AM – 3:30 PM | Tuesday: 7:00 AM – 3:30 PM | Wednesday: 7:00 AM – 3:30 PM | Thursday: 7:00 AM – 3:30 PM | Friday: 7:00 AM – 3:30 PM | Saturday: Closed | Sunday: Closed
4.5 ★
18 reviews
Briner Drilling
3901 E Sunhaven Ln, Kingman, AZ 86409
Monday: 7:00 AM – 5:00 PM | Tuesday: 7:00 AM – 5:00 PM | Wednesday: 7:00 AM – 5:00 PM | Thursday: 7:00 AM – 5:00 PM | Friday: 7:00 AM – 5:00 PM | Saturday: Closed | Sunday: Closed
3.8 ★
10 reviews
Mohave Well Service Inc
4538 Silverado Pkwy, Kingman, AZ 86401
Monday: Open 24 hours | Tuesday: Open 24 hours | Wednesday: Open 24 hours | Thursday: Open 24 hours | Friday: Open 24 hours | Saturday: Open 24 hours | Sunday: Open 24 hours
5 ★
16 reviews
Frequently Asked Questions
How much does a complete well installation cost in Arizona?
A complete well installation in Arizona typically costs $12,000 to $25,000, including drilling, casing, pump system, pressure tank, electrical, and plumbing connections. Northern AZ bedrock wells are at the higher end. AZ's permitting process, required water quality testing, and well completion reporting requirements add to the total cost.
What's included in a complete well installation in Arizona?
A complete installation includes ADWR notices/permits as required, drilling, well casing and cap, grout sealing, submersible pump and motor, pitless adapter, drop pipe, electrical wiring, pressure tank, pressure switch, water line to the home, and initial water-quality testing performed to ADEQ laboratory method expectations for the analytes you select.
How long does it take to install a complete well system in Arizona?
The entire process in AZ typically takes 4-8 weeks from permit application to final approval. Drilling takes 1-3 days, pump and tank installation 1-2 days, and plumbing and electrical connections 1-2 days. Water testing results take 5-10 business days. The AZ permit and inspection process adds time compared to many other states.